It was a day of doing some of the small stuff. I attached the rear rope cleats and installed the front and read nav lights. I also put the new GT sticker on the GT Badge up front. Finally, I installed the hydraulic hoses for the power trim and tilt to the pump. I tried to attach the pump to the floor but I found out that there wasn't enough space for that. I guess I will have to look for another solution. Finally, I added some wire loom to the hoses in the splash well to make them look better.
Rear Rope Cleat
Stern Light
Bow Light
GT Badge Before
GT Badge After
Pump on the Floor
Before Wire Looms
After Wire Looms
No comments:
Post a Comment