It was a day in the 50's, unusual for February in this area, so I took the GT outside to do a little sanding on the transom. There has been extensive work on the transom, including drilling a new drain hole, about 2 inches above the bottom of the boat. I decided that I was going to redrill a drain at the bottom, on the other side of the central stringer, so I did.I filled in the other hole with a plug and gorilla glue. I will glass it in, inside and out, at a later tome. I have a lot of work to do in this area, especially around the splashwell.
A Lot of Sanding. Note the Drain Holes
One of the Holes to be Filled in the Splashwell
Old and New
No comments:
Post a Comment