Friday, December 23, 2011

November 17, 2011 - The Floor

I tore out some fore of the flooring and used the nice new tool that vibrates and cuts. Wow, what a time saver. I cut out well up into the front area and am planning on replacing a lot of floor. I will have to replace or build up the keel stringer as well. I would go all the way up to the front but the top and bottom halves of the boat are so well connected that I do not want to split them apart.

Under the Ski Locker

 Up Front, Starboard Side


 Transom Area

1 comment:

  1. I read your articles and found the article is instructive! I starting late stumbled upon it, Bond cleaning Alexandria | End of lease cleaning Balmain | Bond cleaning Balmain and wish I'd seen it sooner, It's noteworthy for the home, shares some more examination or substance-related cleaning. Grateful for sharing.

    ReplyDelete